Eight connected capabilities on one engine. The first two are the core; the rest extend the same model.

Core

Affordability Pathway

When can I actually afford each part of the build? Phases sequenced against real, time-based finances — not a total budget figure.

Core

Trade-Off Engine

One change → all consequences → ranked alternatives, automatically, the moment a constraint breaks.

Included

Immersive Design Studio

Brief → 2D floor plan, sketch plan, 3D model (WebXR-ready), elevations, exterior and interior concepts, compliance, cost, timeline, materials and EPC views. The design layer that feeds the engine.

Included

Project Reality view

Cost range, finish month, planning reading, heating, carbon and structural triggers on one screen, each expandable to its working.

Included

Future Simulator

Cost shocks, labour gaps, savings shortfalls and rate rises, re-run through the full model and compared side by side.

Included

Project Reality Score

Affordability, planning, sustainability, complexity and timeline, weighted by your priorities, so pathways compare at a glance.

Release 2

Regret Predictor

Decisions that save money today and cost more over ten years — insulation, glazing, removed rooms, heating — with the arithmetic shown.

Release 2

Don't-buy-yet

Order windows for every major purchase, from when its specification is fixed to when it is needed, allowing for lead times and storage.

Roadmap

Outcome calibration

Record what actually happened; predictions tighten with every completed project. Machine learning arrives when there is data to learn from.

What we deliberately don't claim

Floor-plan generation, plot-level planning scores and cost estimators already exist and some are excellent. Sketchr consumes those kinds of data as inputs. What's new is the connection between them and your money over time — and the alternatives, not just the warning.

CapabilityAI design toolsCost estimatorsPlanning checkersSketchr
Generates a designYesInput
Static cost estimateSomeYesLive range
Planning constraintsYesRules + consequence
Phases matched to savings and staged lendingYes
Ranked alternatives when a constraint breaksYes
Regret and procurement timingRelease 2