Estimated cost (P50)
£210,707
P20–P80 £178,164£243,248 · £3,454/m²
Finish month (Balanced phase)
Month 20
Target month 20
Planning route
planning required
risk High · 3 rules triggered · Householder planning application
Heating running cost
£226/yr
Indicative band B · 3,357 kWh/yr
Embodied carbon (A1–A3)
23.0 t
377 kg/m²
Structure
Heavy steel needed
Opening 5.4 m exceeds 4 m: heavy steel with padstones; structural engineer required.

Violations

  • budgetEstimated cost £210,707 exceeds budget £165,000 by £45,707

Reality Score

64
affordability34
planning50
sustainability100
complexity60
timeline100

Planning reading

Rule triggeredReading
Two-storey rear extension projects 4.2 m (> 3 m limit, Class A(f)).required
Conservation area: two-storey or side extensions are not permitted development.required
Two-storey rear extension: PD only if ≥ 7 m from rear boundary and materials match (Class A(h)).uncertain

Cost breakdown

PackageQuantityP50P20–P80Phase
Preliminaries, design & fees
Design, structural engineer, building control, insurances
9 % of works£13,180£11,203£15,157planning
Demolition & strip-out
Strip-out of rear wall and affected fabric
25.5 m2£4,570£3,427£5,712planning
Substructure (foundations & slab)
Ground-bearing slab, insulated; ground risk class C
35 m2£12,342£9,257£15,428substructure
External walls
Cavity wall, standard insulation
93.7 m2wall£26,984£22,937£31,032superstructure
Upper floors
Joisted upper floor
26 m2£3,994£3,395£4,593superstructure
Structural steel / beams
Opening 5.4 m exceeds 4 m: heavy steel with padstones; structural engineer required.
1 item£12,365£9,274£15,456superstructure
Roof structure & covering
Flat warm roof
35 m2roof£7,997£6,797£9,196roof
Windows & external doors
Aluminium double glazed
8.9 m2glaz£9,539£9,062£10,016roof
First fix (electrics, plumbing, carpentry)
Electrics, plumbing, carpentry
61 m2£10,931£9,292£12,571firstfix
Heating system
Gas boiler + radiators (extension of system)
1 item£2,957£2,513£3,400firstfix
Plastering & second fix
Finish tier: good
61 m2£13,469£11,448£15,489secondfix
Kitchen
Kitchen, good tier
1 item£17,920£17,024£18,816secondfix
Bathrooms
1 bathroom(s)
1 count£9,568£8,133£11,003secondfix
Decoration & floor finishes
Decoration & floors
61 m2£8,530£7,251£9,810secondfix
External works & landscaping
Patio, paths, planting
55 m2ext£5,280£3,960£6,600external
Contingency£15,963
VAT (20%)£35,118
Total (P50)£210,707

Timeline breakdown

Unconstrained build programme 13 months · funded finish month 20 on the Balanced phase pathway.

PhaseDurationStartsEndsWaiting for fundsPhase cost
Planning & preliminaries4 monthsMonth 0Month 3None£23,430
Substructure1 monthMonth 4Month 4None£16,291
Superstructure to wall-plate2 monthsMonth 5Month 6None£57,213
Roof & weathertight1 monthMonth 7Month 7None£23,148
First fix2 monthsMonth 8Month 9None£18,332
Second fix & finishes2 monthsMonth 15Month 165 months£65,323
External works1 monthMonth 19Month 192 months£6,970

Carbon breakdown (embodied, A1–A3)

ElementkgCO₂ekg/m² GIAShare
walls8,90114639%
substructure4,2006918%
fitout3,6606016%
roof1,575267%
steel1,400236%
floors1,170195%
external1,100185%
glazing979164%
Total22,986377

Operational heating: 668 kgCO₂e/yr at 3,649 kWh delivered.

All figures are indicative concept-stage ranges from seed reference data. Planning classifications are rule-based readings of the GPDO householder classes, not advice; the energy band is an indicative estimate, not an EPC; structural triggers flag where an engineer is needed. Nothing here is a quote, a lending decision or professional advice.